How we deliver an inspection project

Six stages from requirement to handover. Each one ends with a document you sign off before the next one starts.

Technical review: Frank GuoReviewed

Start with an assessment
// Short answer

An addaScan project runs in six stages: requirement definition, a sample test on your own parts, design and quotation, build with a factory acceptance test (FAT), installation with a site acceptance test (SAT), and training and handover. The acceptance criteria are agreed before the station is built, and each stage ends with a written record, so scope, cost and what counts as working are clear before the shutdown window.

// Six stages

What happens at each stage

Read across a row to see who does what, and what must be true before the project moves on.

  1. Stage 01

    Requirement definition

    You provide
    A description of the product and the defects, how they are found today, line speed, space available and what a missed defect costs.
    We do
    Clarifying questions, a first look at feasibility, and a site visit where needed.
    Document
    Written requirement: products, defects to catch, line conditions, constraints.
    Gate to next stage
    Requirement agreed, and samples available for testing.
  2. Stage 02

    Sample test

    You provide
    Good and defective samples that represent real production, including borderline cases.
    We do
    Image the samples under candidate cameras, lenses and lighting; record what is and is not visible.
    Document
    Feasibility conclusion with example images, limits and open risks.
    Gate to next stage
    The defects that matter are shown to be visible and repeatable.
  3. Stage 03

    Design & quotation

    You provide
    Access to PLC details, drawings or photos of the mounting position, and the shutdown windows.
    We do
    Station architecture, reject and PLC interface, mounting, licences, scope and exclusions.
    Document
    Proposal and quotation, including the acceptance criteria for FAT and SAT.
    Gate to next stage
    Proposal accepted and acceptance criteria signed off.
  4. Stage 04

    Build & FAT

    You provide
    The agreed FAT samples, and attendance at the FAT if you want to witness it.
    We do
    Build the station, develop the recipes, and test against the agreed samples before delivery.
    Document
    FAT record: tests, results and any open points.
    Gate to next stage
    FAT criteria met, or open points agreed in writing.
  5. Stage 05

    Installation & SAT

    You provide
    Access to the line, production time for testing, and your electrician or PLC programmer where changes are needed.
    We do
    Install, connect to the PLC and reject, tune on real production, test changeovers and fault handling.
    Document
    SAT report against the agreed criteria.
    Gate to next stage
    SAT criteria met on your line.
  6. Stage 06

    Training & handover

    You provide
    Operators and technicians available for training.
    We do
    Train operators and technicians; hand over recipes, backups and documentation.
    Document
    Signed handover, documentation set and support plan.
    Gate to next stage
    Station in production use, with support terms agreed.
// Acceptance

FAT and SAT compared

Image processing that works on the bench does not prove the reject works on the line. That is why there are two tests.

Comparison of FAT and SAT
Factory acceptance test (FAT)Site acceptance test (SAT)
WhereBefore delivery, on the built stationOn your line, after installation
ProductsThe agreed FAT sample setReal production, plus seeded defect samples
TestsDetection of each defect, false rejects on good samples, recipe changeovers, outputsThe same at line speed, plus reject and confirmation, PLC signals, fault behaviour, operator workflow
Who attendsaddaScan; you may witnessaddaScan and your production, quality and maintenance team
ResultFAT record with any open pointsSAT report; basis for handover
// Acceptance metrics

Two numbers pull against each other

We define both, with the sample set and method, in the proposal.

01

False reject rate

The share of good products rejected. Measured on a known number of good products at production speed. Too high, and the station wastes product and loses operator trust.

02

Missed defect rate

The share of defective products that pass. Measured by feeding defective products at known positions. For critical faults the target is set with you; small runs cannot prove zero.

03

Reject confirmation

Evidence that each failed product actually left the line. Without it, a missed reject looks like a working station.

// Handover

What you receive at handover

The station must stay useful after we leave. This is the handover set, confirmed in the proposal.

Documentation

Station description, wiring and I/O list, PLC interface description, and operating instructions.

Recipes and backups

Recipe files per product and a full backup of the station configuration.

Training

Operator training for daily use and technician training for cleaning, reference checks and new products.

Support plan

Who to call, what is covered, how remote help works, and the recommended spare parts list.

// FAQ

Delivery questions

How is an inspection project tested, commissioned and handed over?
In two acceptance steps. A factory acceptance test (FAT) checks the station against agreed samples before it reaches site. A site acceptance test (SAT) checks it on your line with real production, including speed, changeovers, rejects and fault handling. Handover follows SAT: training, recipe backups, documentation and a signed-off support plan.
What is tested during FAT and SAT?
At FAT: detection of each agreed defect on the FAT samples, false rejects on good samples, recipe changeovers and the station’s outputs. At SAT: the same on your line at production speed, plus the reject mechanism, confirmation, PLC signals, fault behaviour and the operator workflow. The exact tests and pass criteria are written into the proposal, so nobody argues about them later.
How are false rejects and missed defects measured?
False rejects: run a known number of good products and count how many the station rejects. Missed defects: feed defective products at known positions and count how many pass. Both need a stated sample set, speed and duration. Small test runs cannot prove a zero missed-defect rate, so the method and sample size are agreed with you in advance.
Can machine vision be retrofitted to an existing line?
Usually, if there is space for the camera and lighting, the products can be presented consistently, and there is a way to remove rejects. The site survey checks mounting space, product spacing, the PLC and the reject path. Where one of these is missing, the proposal states what has to change.
What maintenance does a station need after handover?
Keeping optics and lighting clean, checking the reference samples regularly, backing up recipes, and teaching new products when they are introduced. Deep-learning checks may need retraining when products or materials change. What your team does and what we do is written into the support plan.
What is included in a turnkey station?
It is defined in each proposal. Typically: sample test, cameras, optics and lighting, processing and software licence, mounting and enclosure, PLC and reject integration, FAT, installation, SAT, training and documentation. Mechanical changes to your line, a reject mechanism and electrical work outside the station are listed as included or excluded case by case.
// Stage one

Start with the requirement

Tell us the product, the defect and the line. We reply within two working days with questions or a proposed sample test.

Request a Vision Assessment